Name *
Name

The Mt Ovit Tunnel increased excavation speed by 25% after switching to BarChip Reinforced Concrete

Fill in the form to the right to receive your FREE DOWNLOAD of the in depth report on this project that was presented at the World Tunnelling Congress 2014